The Ganther Difference
We’ve removed the stress from the construction process.
Ganther clients are progressive business owners, operators and developers looking for the best value they can get and a stress-free process. Our “Life of a Ganther Project” process was created to ensure that no matter which Ganther team is assigned to your project, the proper steps are followed to deliver quality results — without cost overruns, missed schedules or miscommunication.
Quality & Value
How we offer the best quality at the lowest prices.
Unlike general contractors and design-builders that self-perform their trade work, all Ganther construction is competitively bid using the free-market system.
This lets us provide you with the best prices from the best trade contractors — specialists in their craft who use the latest techniques and equipment. The result is true market pricing, higher quality work, and accountability on every line of your budget.
Life of a Ganther Project
Within our process, we provide:
A clear, repeatable framework that carries your project from first budget to final warranty visit — with full transparency at every stage.
01
Pre-Construction
Smart planning and accurate budgeting before a single shovel hits the ground.
-
Project Budgeting
- Soft Costs — site acquisition, design, consultants, F.F. & E., technology, permits
- Hard Costs — detailed breakdown of site improvement and construction costs
02
Professional At-Risk Construction Management
Dedicated leadership, open-book pricing and a guaranteed schedule through completion.
- Dedicated project manager and support team
- On-site field superintendent
- Documentation and quality control
- Guaranteed schedule using critical path method (CPM) software
- Competitive bidding and post-bid analysis of all construction trades to local, qualified, trade-specific contractors and self-performing general contractors
- 100% open-book disclosure of all labor, material and equipment costs
- Guaranteed Maximum Price (GMP)
- Incorporation of sustainable methods and practices
- Safety and risk management
03
Post-Occupancy
Support that continues well after you move in — including a full warranty and an 11-month follow-up.
- Owner startup and maintenance training of building and mechanical systems
- Assembly of the Owner’s manual — including Ganther’s Warranty Certificate, as-built drawings and specifications, warranty information and a trade contractor directory
- Minimum one-year Ganther Warranty on materials and workmanship
- Eleven (11) month site visit after occupancy to assess building performance and correct warranty items
- Priority service for post-occupancy issues after the one-year warranty period expires
Ready to build your legacy?
Let’s talk through your project, your budget and your timeline.
Start Your Project