We’ve removed the stress from the construction process.

Ganther clients are progressive business owners, operators and developers looking for the best value they can get and a stress-free process. Our “Life of a Ganther Project” process was created to ensure that no matter which Ganther team is assigned to your project, the proper steps are followed to ensure quality results without cost overruns, missed schedules or miscommunication.

How we can offer the best quality and the lowest prices.

Unlike general contractors and design-builders that self-perform their trade work, all Ganther construction is competitively bid using the free-market system. This lets us provide you with the best prices from the best trade contractors – contractors that specialize in their craft using the latest techniques and equipment.

Within our “Life of a Ganther Project” process we provide:

  • Pre-Construction
    • Project Budgeting:
      • Soft Costs (Site acquisition, design, consultants, F.F. & E.,
        technology, permits)
      • Hard Costs (Breakdown of site improvement and
        construction costs)
  • Professional At-Risk Construction Management
    • Dedicated project manager and support team
    • On-site field superintendent
    • Documentation and quality control
    • Guaranteed schedule using critical path method (CPM) software
    • Competitive bidding and post-bid analysis of all construction trades to local,
      qualified trade-specific contractors and self-performing general contractors
    • 100% Open-book disclosure of all labor, material and equipment costs
    • Guaranteed Maximum Price (GMP)
    • Incorporation of sustainable methods and practices
    • Safety and risk management
  • Post Occupancy
    • Owner startup and maintenance training of building and mechanical systems
    • Assembly of Owner’s manual that includes Ganther’s Warranty Certificate,
      as-built drawings and specifications, warranty Information and trade contractor
      directory
    • Minimum one-year Ganther Warranty on materials and workmanship
    • Eleven (11) month site visit after occupancy to assess building performance and correct warranty items
    • Priority service with post-occupancy issues after the expiration of the one-year warranty period